İçeriğe geç

Quality

Quality is built into every link of the chain, not checked at the end

Working under ISO 9001, a TSE service qualification certificate and TS EN standards, we control quality at seven points from raw material intake to dispatch papers.

Our certificates

Our production runs within the framework set by national and European standards. Our certificates both sustain our own quality management and are renewed so that we meet our customers' legal and operational obligations.

  • TSE Service Qualification Certificate
  • ISO 9001:2015 Quality Management System
  • TS EN 12258 — Road tankers with fixed equipment
  • TS EN 13881 — ADR tankers
  • EN 13445 — Welded pressure vessels
  • TS EN 10025 — Structural steels
  • TS EN ISO 3166 — Standard for welder qualification

The chain of quality control points

Quality is not a value measured at the end of a production line; it is built into every link of it. Let us walk through the seven main points.

1. Raw material intake

For every plate and section entering the store, the supplier and the material certificate are checked. Chemical composition, mechanical properties and the suitability of the plate for profiling are verified from the certificate.

2. Plate identification and profile analysis

Plates are identified, and the record of which part of which tank they were used in is kept. The groove strength calculation determines the required plate thickness and steel grade. If the calculation requires it, thickness is increased and never reduced.

3. Cutting and forming

Cutting is performed on CNC-controlled tables. Edge quality, bevel angle and surface regularity are checked. After forming and plate rolling, dimensions are verified by visual inspection and against the template.

4. Welding

Welding is carried out according to the approved WPS. The procedure is supported by procedure records under EN ISO 15614-1, 135 MAG and 141 TIG applications, and welder qualification certificates. Full penetration and a clean root bevel are checked visually and by penetrant testing.

5. Painting and coating

Before painting, the surface is brought to Sa 2½ by abrasive blasting. Chromate conversion, epoxy primer and 2K polyurethane topcoat are applied in sequence. Dry film thickness is measured, and any surface outside the target range is reprocessed.

6. Assembly and leak tightness

Torque values are recorded after fitting valves, manholes, ladders and accessory kits. The shell and connection points are subjected to a leak tightness test; any leaking joint is dismantled and re-welded.

7. Strength calculation and road test

The vessel is dimensioned according to EN 13445 and static strength calculations. Calculation outputs are placed in the approval file. Where required, the vehicle is taken out on a road test together with the customer's representative.

Traceability

  • Certificate number and identification data for every plate used
  • Applied WPS, PQR and WPQR records together with welder qualification certificates
  • Leak tightness, strength and road test reports
  • Dry film thickness measurement records
  • Consignment note and delivery documents issued at dispatch

Document list

  • TSE Service Qualification Certificate
  • ISO 9001:2015 Quality Management System Certificate
  • Tanker conformity documents for ADR transport
  • TIR carnet and vehicle registration formalities
  • Periodic inspection and test reports

The value of a vehicle is measured not by its first year in the field but by how many years it works without trouble.

Projeniz için fiyat ve süre öğrenin

Ölçü, kapasite ve kullanım alanını yazın; teknik ekibimiz size özel bir teklifi 1 iş günü içinde hazırlasın.