Production Process

Six steps from measurement to delivery

Six controlled steps from survey to commissioning: measurement, design, cutting and forming, welding, coating and painting, assembly, testing and delivery.

Our production process

A tanker is not completed in a single night; it takes six controlled steps. Each step feeds the next, and if a fault appears the process stops there and returns to its source. Below you will find these six steps, what is done in them and roughly how long they take.

Cutting and welding are completed within days, while design and approval are often the longest part. For this reason we put the project plan in writing from the first day and report progress regularly. The transitions between steps are recorded as well: which part passed which stage, whose approval moved it forward and when it was delivered.

1. Survey and measurement

The first step manufactures nothing; it only asks the right questions. Quoting a firm price without visiting the site is no guarantee that the job will be done correctly.

  • Site visit and measurement of the pit
  • Determination of the lower and upper levels of the pit and a height restriction check
  • The route of the vehicle: ramps, bends, bridge heights and ground bearing capacity
  • Capacity calculation according to the density of the product to be carried
  • Review of existing vehicle and TIR constraints
  • Determination of axle spacing, neck and dolly layout

The measurement results become a table: pit dimensions, route notes and a capacity proposal. We do not quote a price without this table.

Typical duration: 3–5 working days

2. Project and design

Once the dimensions are established, the project moves onto paper. Technical and commercial decisions are made together here.

  • Shell, dolly and equipment drawing in CAD
  • Strength calculation and determination of the required plate thickness
  • Volume optimisation: selection of the number and position of baffles
  • Material selection: carbon steel or aluminium, coating requirement
  • Preparation of the approval file
  • Drawing the layout together with route and manoeuvring checks
  • Obtaining customer approval for confidentiality and sealing

During design, details such as the filling neck, the number of manholes, ventilation and the access ladder are decided together. Each of them is a decision that is expensive to change later.

Typical duration: 5–7 working days

3. Plate cutting and forming

The material leaves the store and takes its shape for the first time. This is the stage at which a fault is cheapest to correct.

  • Removal of parts from the table by plasma and oxy-fuel cutting
  • Formation of shell rings and conical sections on the CNC plate roll
  • Shaping of flanges and support parts by mould, press and hydraulic press
  • Opening of the root bevel and dressing of cut ends
  • Marking of parts according to the assembly sequence

After forming, every part is measured individually. A part outside tolerance is reprocessed; correcting it here is always cheaper than forcing it during assembly.

Typical duration: 4–6 working days

4. Welding

Welding is the step that determines the future of the tanker. A fault here is expensive to repair later.

  • Chassis joint, dolly assembly and alignment of the shell rings
  • MAG welding in the robotic cell, fine TIG welding in the TIG cells
  • Application of approved WPS instructions and recording of parameters
  • Weld cap dressing and reinforcement
  • Distortion control and measurement

During welding the parts are fixtured and the parameters recorded. Once the joint has been checked, assembly moves on to the next part.

Typical duration: 7–12 working days

5. Coating and painting

Paint is the layer that determines the life of the tanker. The cleaner the surface underneath, the longer the vessel lives.

  • Degreasing of the surface to remove oil and dirt
  • Bringing the surface up to Sa 2½ by abrasive blasting
  • Chromate conversion and anti-rust primer
  • Epoxy primer and intermediate coat application
  • 2K polyurethane topcoat, dry film thickness measurement and oven curing where required
  • Re-measuring and recording the remaining film thickness
  • Record of oven and curing conditions

Before coating the entire surface is checked again. Chromate conversion, intermediate coat and dry film thickness measurements are recorded and added to the handover file.

Typical duration: 6–9 working days

6. Assembly, testing and delivery

In the final step the tanker stops being a product and becomes a working system.

  • Fitting of manhole, valves, ladder and the accessory kit
  • Leak tightness test and rework of any point where leakage is found
  • Completion of the strength calculation and the road test
  • Preparation of the registration plate, sealing and document file
  • Commissioning training and handover
  • Delivery of the operating and maintenance manual

At handover the file is delivered together with the vehicle: test reports, the strength calculation and the operating manual. Commissioning training is demonstrated practically to your operations team.

Typical duration: 4–6 working days

A note on planning

The duration of the six steps is never calculated on its own; waiting times in between are written into the plan as well. When material supply, customer approval or the dispatch date remain uncertain, the project extends on its own. For this reason we state the starting condition of each next step clearly and update the schedule together with the customer where necessary.

An average road tanker is completed in roughly 30–45 working days from measurement to handover. For urgent projects this period shortens according to available welding capacity.